Indonesia · Completed in 2024
YOU YOUNG INDONESIA
Industrial wastewater treatment system — Construction + O&M
Under O&M
AI · INDUSTRIAL · ENVIRONMENT
The principles behind TISEON
Technology
Technology applied on site
Integration
Connecting technology, equipment & AI
Sustainability
Water reuse & sustainability
Engineering
Design, construction & plant expertise
Operations
Operations beyond completion
Next
Towards the next industrial era
Building on DMC's construction, plant, equipment and environmental engineering, we design and implement wastewater recycling and site-specific AI, inspection and automation projects.
Engineering · Development · Construction · Installation
Core business
RO-based recycling of industrial wastewater into reusable water is TISEON's core business. Our responsibility extends beyond design and construction to operations and maintenance.
01
Wastewater inlet
02
Pretreatment
03
Membrane filtration (TMF/UF)
04
RO
05
Reuse
Depending on site conditions, we have designed and operated RO reuse systems with recovery up to approximately 60%. Recovery varies with factory and water quality conditions and is not guaranteed for every site — a site assessment is required to specify it.

RO system · Actual installation · Actual photograph
YOU YOUNG INDONESIA
Indonesia · Completed in 2024
YOU YOUNG VINA
Vietnam · Completed in late 2025
Engineering foundation
DMC's experience in construction, plants and specialized equipment is the foundation of every business area. We carry out design, construction, supervision and permitting.


New growth business
A new business built on engineering that understands industrial sites. Rather than selling a standalone inspection device, we deliver tailored AI projects starting with the customer's on-site problem.
AI is TISEON's new growth business. It is being built on our existing engineering foundation, not presented as a long-established, fully validated business.
01
Define the problem
Identify on-site inspection, monitoring and automation problems together
02
Feasibility review
Review data, equipment conditions and implementation feasibility
03
Pilot development & validation
Develop and validate performance on the actual line
04
On-site implementation
Implement only the scope that passes validation
05
Operate & improve
Continuous improvement using operational data
PROJECTS
Only confirmed projects are published. Other project history will be disclosed after revalidation.
Indonesia · Completed in 2024
Industrial wastewater treatment system — Construction + O&M
Under O&M
Vietnam · Completed in late 2025
Industrial wastewater treatment system — Construction + O&M
Under O&M
Vietnam
Tenter dust collector installation
Installation completed
Discuss implementation and your site's requirements
dmc@tiseon.com · +84 918 567 780